Okay, actually did something after kind of ghosting this board for about 2 weeks.
Shift was only 6 hours today instead of 8, so legs weren’t as swollen when I got home, and I did 15 squats before I could talk myself out of it. That’s up from the 10 I managed last time.
Plan for the next 2 weeks: squats every other day, nothing fancy, whatever I can manage after a shift. This might just be me, but going slow feels like the only way this actually sticks for someone who’s never done structured exercise before.
Ankles are still a little swollen right now, but one thing at a time!
